PERENCANAAN DRAINASE DAN SUMUR RESAPAN PERUMAHAN PALM HILL CILEGON, JAWA BARAT

Miftakhul Yaqin, Mohammad Zenurianto, Suhartono

Abstract


Palm Hill housing must be completed with a proper drainage system and infiltration well to prevent it from surface run off water. The objective of the study is to design the drainage system and the infiltration well completed with its implementation time and budget.

Topograpical map was needed to find out the elevation. Rainfall data from 3 nearby stations of Ciruas, Petir, and Serang were calculated through Log Pearson III method to find out the proposed rain fall at 10-year time reture. Waste water discharge was estimated 80% out of 364 houses. Cumulative discharge was resulted from the addition of run off to infiltration well to waste water discharges. The result was processed using Manning formula to design the culvert dimension.

The calculations result in 6 different culvert dimensions,1 types of culvert,358 infiltration well, 277 work days at IDR2,954,079,288

Keywords: drainage system,  infiltration well


Full Text:

PDF


DOI: http://dx.doi.org/10.33795/prokons.v9i2.90

Refbacks

  • There are currently no refbacks.


Copyright (c) 2017 PROKONS Jurnal Teknik Sipil



INDEXING : 

The following is an indexing list that includes the journal of the Prokons, published by the Civil Engineering Department, Politeknik Negeri Malang

          

   

     

 

_______________________________________________________________________________________________

Jurusan Teknik Sipil Politeknik Negeri Malang

Jalan Soekarno-Hatta No. 09, PO BOX 04 Malang 65141

Telp  0341-404424 ||  Fax  0341-404420

ISSN  Print (1978-1784) ||  Online (2714-8815)

Email  : prokons@polinema.ac.id

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License .