ANALISIS PENERAPAN SISTEM PENJADWALAN DENGAN METODE PERT PADA PROYEK KONSTRUKSI (STUDI KASUS: REHABILITASI DAN PENINGKATAN INFRASTRUKSI PASAR TRADISONAL KOTA MALANG)

Faris Rizal Andardi

Abstract


PERT is a simplified software, to produce the expected project completion probability based on the duration or duration of a particular contract. In developing the PERT method a lot of research was carried out to perfect this method. The purpose of this study is to determine the overall duration of project completion, the magnitude of the project probability that can be completed in less than 170 days and more than 170 days, and the project completion time with the highest probability. Results of Analysis of Implementation of Scheduling System with PERT Method in Rehabilitation and Improvement of Traditional Market Infrastructure Projects in Malang City is the total duration of simulation results obtained 168 days faster than the 172 day plan. The probability of completing the 168 day project is 50%, while the probability of completing the 172 day project is 85.31%. The highest chance of the project being completed is 99.97%, with a duration of 181 days.

Full Text:

PDF

References


Aja, R. O., & Chukwu, W. I. . (2018).

Application of Project Evaluation , Review

Technique and Critical Path Method (

PERT-CPM ) Model in Monitoring

Building Construction, 35(December),

–2413.

https://doi.org/10.5829/idosi.wasj.2017.24

2413

Alwi, M. A., & Syahrizal, I. (2015). Analisis

Penerapan Sistem Penjadwalan CPM ,

PERT , Dan LOB Pada Penjadwalan

Proyek ( Studi Kasus : Pembangunan

Gedung Kantor PT . Jasa Asuransi

Indonesia – Pematang Siantar ). Analisis

Penerapan Sistem Penjadwalan CPM ,

PERT , Dan LOB Pada Penjadwalan

Proyek ( Studi Kasus : Pembangunan

Gedung Kantor PT . Jasa Asuransi

Indonesia – Pematang Siantar ), 1–13.

Aziz, R. F. (2014). RPERT: Repetitive-projects

evaluation and review technique.

Alexandria Engineering Journal, 53(1),

–93.

https://doi.org/10.1016/j.aej.2013.08.003

Cottrell, . Wayne D. (1999). B Angladesh P

Rogram E Valuation : Construction

Engineering and Management,

(February), 16–22.

Dawood, N. (1998). Construction Management

and Economics Estimating project and

activity duration : a risk management

approach using network analysis

Estimating project and activity duration : a

risk management approach using network

analysis. Construction Management and

Economics, 16, 41–48.

Hajdu, M. (2013). Effects of the application of

activity calendars on the distribution of

project duration in PERT networks.

Automation in Construction, 35, 397–404.

https://doi.org/10.1016/j.autcon.2013.05.02

Karabulut, M. (2017). Application of Monte

Carlo simulation and PERT/CPM

techniques in planning of construction

projects: A Case Study. Periodicals of

Engineering and Natural Sciences, 5(3),

–420.

https://doi.org/10.21533/pen.v5i3.152

Kehinde, O. M., Afolabi, O. J., & Babawale, A.

(2017). APPLICATION OF PROJECT

EVALUATION AND REVIEW

TECHNIQUE (PERT) IN ROAD

CONSTRUCTION PROJECTS IN

NIGERIA Onifade Morakinyo Kehinde,

Oluwaseyi Joseph Afolabi, Ajuwon

Babawale Department of Management

Technology, Bells University of

Technology, Ota, Nigeria. European

Porject Management, 7(2), 3–13.

Kikelomo, O., & Olalekan, J. (n.d.). Application

of Critical Path Method ( CPM ) and

Project Evaluation Review Techniques (

PERT ) in Project Planning and

Scheduling. Journal of Mathematics and

Statistical Science, 6, 1–8.

Liu, M. (2013). Program evaluation and review

technique (PERT) in construction risk

analysis. Applied Mechanics and

Materials, 357–360, 2334–2337.

https://doi.org/10.4028/www.scientific.net/

AMM.357-360.2334

Lu, B. M., & Abourizk, S. M. (2000). S

IMPLIFIED CPM / PERT S IMULATION

M ODEL. Journal of Construction

Engineering and Management, 126(June),

–226.

Rozy, Anugerah Fakhrur., & Waibo, O. R. G.

(2014). Manajemen Waktu, Biaya, dan

SDM Proyek Konstruksi Pada

Pembangunan Gedung Ruang Kuliah FIA

Universitas Brawijaya Malang Dengan

Menggunakan Metode PERT dan PDM.

Media Teknik Sipil, 12(1), 10–19.

Salas-Morera, L., Arauzo-Azofra, A., GarcíaHernández, L., Palomo-Romero, J. M., &

Ayuso-Muñoz, J. L. (2018). New

Approach to the Distribution of Project

Completion Time in PERT Networks.

Journal of Construction Engineering and

Management, 144(10), 1–12.

https://doi.org/10.1061/(ASCE)CO.1943-

0001552

Setiawati, S., Syahrizal, & Rezky Ariessa Dewi.

(2017). Penerapan Metode CPM Dan

PERT Pada Penjadwalan Proyek

Konstruksi (Studi Kasus: Rehabilitasi /

Perbaikan Dan Peningkatan Infrastruktur

Irigasi Daerah Lintas Kabupaten/Kota D.I

Pekan Dolok). Jurnal Teknik Sipil USU,

(1), 1–14. Retrieved from

https://jurnal.usu.ac.id/index.php/jts/article

/viewFile/16596/7011

Wardani, N. M. E., Musdalifah, S., & Lusiyanti,

D. (2018). Optimalisasi Biaya Dan Waktu

Pelaksanaan Proyek Pembangunan

Perumahan Citraland Palu Menggunakan

Metode Program Evaluation and Review

Technique (Pert) – Critical Path Method

(Cpm). Jurnal Ilmiah Matematika Dan

Terapan, 15(2), 197–208.

https://doi.org/10.22487/2540766x.2018.v

i2.11353

Zhong, D. H., & Zhang, J. S. (2003). New

method for calculating path float in

program evaluation and review technique

(PERT). Journal of Construction

Engineering and Management, 129(5),

–506.

https://doi.org/10.1061/(ASCE)0733-

(2003)129:5(501




DOI: http://dx.doi.org/10.33795/prokons.v14i2.269

Refbacks

  • There are currently no refbacks.


Copyright (c) 2021 Faris Rizal Andardi

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

INDEXING : 

The following is an indexing list that includes the journal of the Prokons, published by the Civil Engineering Department, Politeknik Negeri Malang

          

   

     

 

_______________________________________________________________________________________________

Jurusan Teknik Sipil Politeknik Negeri Malang

Jalan Soekarno-Hatta No. 09, PO BOX 04 Malang 65141

Telp  0341-404424 ||  Fax  0341-404420

ISSN  Print (1978-1784) ||  Online (2714-8815)

Email  : prokons@polinema.ac.id

 

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License .