ANALISIS PENERAPAN SISTEM PENJADWALAN DENGAN METODE PERT PADA PROYEK KONSTRUKSI (STUDI KASUS: REHABILITASI DAN PENINGKATAN INFRASTRUKSI PASAR TRADISONAL KOTA MALANG)
Abstract
Full Text:
PDFReferences
Aja, R. O., & Chukwu, W. I. . (2018).
Application of Project Evaluation , Review
Technique and Critical Path Method (
PERT-CPM ) Model in Monitoring
Building Construction, 35(December),
–2413.
https://doi.org/10.5829/idosi.wasj.2017.24
2413
Alwi, M. A., & Syahrizal, I. (2015). Analisis
Penerapan Sistem Penjadwalan CPM ,
PERT , Dan LOB Pada Penjadwalan
Proyek ( Studi Kasus : Pembangunan
Gedung Kantor PT . Jasa Asuransi
Indonesia – Pematang Siantar ). Analisis
Penerapan Sistem Penjadwalan CPM ,
PERT , Dan LOB Pada Penjadwalan
Proyek ( Studi Kasus : Pembangunan
Gedung Kantor PT . Jasa Asuransi
Indonesia – Pematang Siantar ), 1–13.
Aziz, R. F. (2014). RPERT: Repetitive-projects
evaluation and review technique.
Alexandria Engineering Journal, 53(1),
–93.
https://doi.org/10.1016/j.aej.2013.08.003
Cottrell, . Wayne D. (1999). B Angladesh P
Rogram E Valuation : Construction
Engineering and Management,
(February), 16–22.
Dawood, N. (1998). Construction Management
and Economics Estimating project and
activity duration : a risk management
approach using network analysis
Estimating project and activity duration : a
risk management approach using network
analysis. Construction Management and
Economics, 16, 41–48.
Hajdu, M. (2013). Effects of the application of
activity calendars on the distribution of
project duration in PERT networks.
Automation in Construction, 35, 397–404.
https://doi.org/10.1016/j.autcon.2013.05.02
Karabulut, M. (2017). Application of Monte
Carlo simulation and PERT/CPM
techniques in planning of construction
projects: A Case Study. Periodicals of
Engineering and Natural Sciences, 5(3),
–420.
https://doi.org/10.21533/pen.v5i3.152
Kehinde, O. M., Afolabi, O. J., & Babawale, A.
(2017). APPLICATION OF PROJECT
EVALUATION AND REVIEW
TECHNIQUE (PERT) IN ROAD
CONSTRUCTION PROJECTS IN
NIGERIA Onifade Morakinyo Kehinde,
Oluwaseyi Joseph Afolabi, Ajuwon
Babawale Department of Management
Technology, Bells University of
Technology, Ota, Nigeria. European
Porject Management, 7(2), 3–13.
Kikelomo, O., & Olalekan, J. (n.d.). Application
of Critical Path Method ( CPM ) and
Project Evaluation Review Techniques (
PERT ) in Project Planning and
Scheduling. Journal of Mathematics and
Statistical Science, 6, 1–8.
Liu, M. (2013). Program evaluation and review
technique (PERT) in construction risk
analysis. Applied Mechanics and
Materials, 357–360, 2334–2337.
https://doi.org/10.4028/www.scientific.net/
AMM.357-360.2334
Lu, B. M., & Abourizk, S. M. (2000). S
IMPLIFIED CPM / PERT S IMULATION
M ODEL. Journal of Construction
Engineering and Management, 126(June),
–226.
Rozy, Anugerah Fakhrur., & Waibo, O. R. G.
(2014). Manajemen Waktu, Biaya, dan
SDM Proyek Konstruksi Pada
Pembangunan Gedung Ruang Kuliah FIA
Universitas Brawijaya Malang Dengan
Menggunakan Metode PERT dan PDM.
Media Teknik Sipil, 12(1), 10–19.
Salas-Morera, L., Arauzo-Azofra, A., GarcíaHernández, L., Palomo-Romero, J. M., &
Ayuso-Muñoz, J. L. (2018). New
Approach to the Distribution of Project
Completion Time in PERT Networks.
Journal of Construction Engineering and
Management, 144(10), 1–12.
https://doi.org/10.1061/(ASCE)CO.1943-
0001552
Setiawati, S., Syahrizal, & Rezky Ariessa Dewi.
(2017). Penerapan Metode CPM Dan
PERT Pada Penjadwalan Proyek
Konstruksi (Studi Kasus: Rehabilitasi /
Perbaikan Dan Peningkatan Infrastruktur
Irigasi Daerah Lintas Kabupaten/Kota D.I
Pekan Dolok). Jurnal Teknik Sipil USU,
(1), 1–14. Retrieved from
https://jurnal.usu.ac.id/index.php/jts/article
/viewFile/16596/7011
Wardani, N. M. E., Musdalifah, S., & Lusiyanti,
D. (2018). Optimalisasi Biaya Dan Waktu
Pelaksanaan Proyek Pembangunan
Perumahan Citraland Palu Menggunakan
Metode Program Evaluation and Review
Technique (Pert) – Critical Path Method
(Cpm). Jurnal Ilmiah Matematika Dan
Terapan, 15(2), 197–208.
https://doi.org/10.22487/2540766x.2018.v
i2.11353
Zhong, D. H., & Zhang, J. S. (2003). New
method for calculating path float in
program evaluation and review technique
(PERT). Journal of Construction
Engineering and Management, 129(5),
–506.
https://doi.org/10.1061/(ASCE)0733-
(2003)129:5(501
DOI: http://dx.doi.org/10.33795/prokons.v14i2.269
Refbacks
- There are currently no refbacks.
Copyright (c) 2021 Faris Rizal Andardi

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
INDEXING :
The following is an indexing list that includes the journal of the Prokons, published by the Civil Engineering Department, Politeknik Negeri Malang
_______________________________________________________________________________________________
Jurusan Teknik Sipil Politeknik Negeri Malang
Jalan Soekarno-Hatta No. 09, PO BOX 04 Malang 65141
Telp 0341-404424 || Fax 0341-404420
ISSN Print (1978-1784) || Online (2714-8815)
Email : prokons@polinema.ac.id
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License .