PENGARUH KEMACETAN DI SIMPANG CILIWUNG TERHADAP DERAJAD PELAYANAN DI SIMPANG PROGRESIF
Abstract
Abstract
Highway in Malang there that needs to be analyzed is Intersections Letjend S. Parman Street – Ciliwung Street
and Letjend Sutoyo Street – Letjend Selorejo. The road is an arterial road in the city of Malang with a high vehicle
density level (Saputra, 2013). The Street was a high traffic flow led to queues or long saturated flow that is not
supported by the settings of the light signals in accordance with the conditions in the field so often causes
congestion.
From finding a solution the traffic density in the study Letjend S Parman Street – Ciliwung Street and Letjend
Sutoyo Street – Letjend Selorejo with Indonesia Highway Capasity Manual (IHCM).
After stages 3-signal coordination calculation in Ciliwung Intersection of Malang, Intersection obtained time
peak hours at the intersection area occurred at 11.00 – 12.00 GMT. Performance 3-waay junction on the Ciliwung
Malang at this time has not met the target. Seen from there is still a Degree of Saturation (DS) which do not meet
the targets ( ≤ 0,75), namely 0,83. After having don e engineering into 3 phases and cycle time 100 minutes Degree
of Saturation (DS) be 0,77.
Keywords: intersection, peak hours, capacity and degree saturation
Full Text:
PDFDOI: http://dx.doi.org/10.33795/prokons.v11i1.121
Refbacks
- There are currently no refbacks.
Copyright (c) 2018 PROKONS Jurnal Teknik Sipil
INDEXING :
The following is an indexing list that includes the journal of the Prokons, published by the Civil Engineering Department, Politeknik Negeri Malang
_______________________________________________________________________________________________
Jurusan Teknik Sipil Politeknik Negeri Malang
Jalan Soekarno-Hatta No. 09, PO BOX 04 Malang 65141
Telp 0341-404424 || Fax 0341-404420
ISSN Print (1978-1784) || Online (2714-8815)
Email : prokons@polinema.ac.id
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License .